Assabet River Rail Trail

The Assabet River Rail Trail is a paved path on an old railroad line in two open parts: about 5 miles from Marlborough to Hudson, and about 3.4 miles from South Acton through Maynard to the Stow line. The two parts do not connect yet. People use it for easy rides and walks between town centers, ponds and the Assabet River.

Length
8.5 mi
rail trail
Surface
Paved
Get on at
8 places
on the map

From Lincoln Street at Highland Street to South Acton station

Parking at 6 of the 8 places to get on · See where

Train back from South Acton station · Next trains

Open. No closures as of Oct 21, 2026.

Where to get on

Numbers match the list; P has parking.

Download the GPX

For Ride with GPS, Strava, Komoot or a bike computer.

  1. Lincoln Street at Highland Street, Marlborough (south end)

    South end of the trail, near downtown Marlborough.

    MWRTA Route 108 and the 495 Connector stop at Newton and Weed Streets, about a 5 minute walk.
    Directions
  2. Hudson Street, Marlborough

    Main Marlborough parking for the trail. North of here the trail passes Fort Meadow Reservoir and wetlands along Flagg Brook.

    Lots off Hudson Street across from Kelleher Field, and at 56 Jefferson St.
    Directions
  3. Washington Street (Route 85), Hudson

    Road crossing on Route 85.

    Trail parking at 157 Washington St, Hudson.
    Directions
  4. Main Street (Route 62), downtown Hudson

    The trail crosses Main Street in downtown Hudson. Shops and places to eat nearby.

    Directions
  5. Wilkins Street lot, Hudson (end of the south section)

    End of the south section. The Mass Central Rail Trail starts here and runs east to Sudbury. The ARRT does not go on to Stow. The next open part starts at White Pond Road, about 4 miles away by the old rail line.

    Trail lot off Wilkins Street.
    Directions
  6. White Pond Road, Maynard/Stow line (end of the north section)

    South end of the paved north section. Track Road, a dirt road open to the public, goes on west from here into Stow.

    Parking at the White Pond Road trailhead.
    Directions
  7. Main Street, downtown Maynard

    The trail runs through downtown Maynard, near the Mill and Main complex. Shops and places to eat nearby.

    Maynard municipal lots in the town center.
    Directions
  8. South Acton station, Acton (north end)

    North end of the trail.

    South Acton station, MBTA Fitchburg Line commuter rail. MWRTA 495 Connector also stops at the station.
    Trail parking on Maple Street, by the station.
    Directions

Getting there

By transit
Take the MBTA Fitchburg Line commuter rail to South Acton.
More

The trail starts at the station and runs south through Maynard. For the Marlborough end, MWRTA Route 108 and the 495 Connector stop at Newton and Weed Streets, a short walk from the trail.

Parking
Marlborough: lots off Hudson Street and at 56 Jefferson St.
More

Hudson: Wilkins Street and 157 Washington St. Maynard: town center lots and White Pond Road. Acton: Maple Street by South Acton station.

Ride out, train home

Ride the trail one way and take the Commuter Rail back. South Acton station is right on the trail.

Keep going

The Assabet River Rail Trail joins other paths and protected bike lanes. Pick a direction to see it on the map.

This trail Where you can keep going Other bike paths

About the Assabet River Rail Trail

Surface
Paved on both open sections. Track Road in Stow, past the end of the north section, is a dirt road.
Food
Places to eat in downtown Hudson and downtown Maynard, where the trail crosses Main Street.
Who looks after it
Each town looks after its own part (Marlborough, Hudson, Maynard and Acton). Assabet River Rail Trail, Inc. (ARRT Inc.) is the volunteer nonprofit that supports the trail.
Also called
ARRT, Assabet Rail Trail, Assabet River Trail, Assabet River Bike Path