
Mass Central Rail Trail
A rail trail that will one day run 104 miles from Boston to Northampton, built in pieces town by town. The paved Wayside section links Waltham to Hudson through quiet woods and wetlands, and the stone dust Wachusett section follows the Quinapoxet River and climbs through Holden and Rutland.
- 长度
- 68 英里
- rail trail
- 路面
- 混合路面
- 铺装和未铺装
- 入口
- 7 处
- 见地图
从Beaver Street到Muddy Pond lot
7 个入口中有 6 个可停车 · 查看位置
冬季不铲雪 · 由谁清扫
开放。 截至 2026年10月26日 无封闭。
从哪里进入
Beaver Street, Waltham (east end of the Wayside section)
East end of the open Wayside trail. Paved. Trail parking in Waltham is very limited.
- MBTA bus 554 stops on Beaver Street at Waverley Oaks Road
Wayland Center, historic Wayland Depot (Route 27)
Cafes, bakeries and shops in Wayland Center next to the trail. The open trail goes on west to Route 20 at Russell's Garden Center, then stops. The gap to Sudbury is about 1.5 miles; use Pelham Island Road and Landham Road.
- Parking near the Wayland Depot and old Wayland station.
South Sudbury, Union Avenue
On the Sudbury to Hudson section that opened July 16, 2026. Coffee shops and food stores about a quarter mile south on a busy road.
- Street parking along Station Avenue.
Hudson, Wilkins Street lot (Assabet River Rail Trail)
West end of the new 7.5-mile Sudbury to Hudson section. Meets the Assabet River Rail Trail here.
- Assabet River Rail Trail parking lot off Wilkins Street.
Thomas Street lot, West Boylston (Oakdale)
East end of a 3-mile stone dust stretch along the Quinapoxet River to River Street in Holden.
- Trail parking lot on Thomas Street. Can fill by mid-morning on summer weekends.
Manning Street lot, Holden
Cross Manning Street at the flashing crosswalk. Year-round accessible portable toilets at the River Street and Mill Street lots nearby.
- Large lot near 200 Manning Street.
Muddy Pond lot, Route 122, Rutland (near the Oakham line)
Start of the Rutland trail guide. The Route 122 lot (about 30 cars, year-round accessible portable toilet) is 1.3 miles east on the trail. Stone dust surface, passes Rutland State Park.
- Lot on the north side of Route 122, with a short ramp to the trail.
如何到达
- 乘公交
- In Waltham, MBTA bus 554 stops at the Beaver Street end, and Waltham commuter rail station (Fitchburg Line) is about half a mile south of the trail.
展开收起
No MBTA service was verified near the Wayland, Sudbury, Hudson or Wachusett sections.
- 停车
- Wayside section: small lots and street parking at Wayland Center, South Sudbury (Station Avenue), Hudson (Wilkins Street lot) and Weston, with very little in Waltham.
展开收起
Wachusett section: free lots at Thomas Street (West Boylston), Manning Street, Mill Street and River Street (Holden), and Route 122, Miles Road and Glenwood Road (Rutland).
这条步道上的 Roams
Roam 是一条沿途设有站点的自助路线。免费的 Shift 应用会在每个站点为你签到,走完即可解锁徽章。
整条步道
Wachusett Greenways (Mass Central Rail Trail)
Rock cuts, tunnel murals, and the Quabbin-Wachusett water connection
7.3 英里 48 分钟在 Shift 应用中
Photo: Pi.1415926535 / Wikimedia Commons, CC BY-SA 3.0整条步道
Mass Central Rail Trail: Sudbury to Hudson
Rail history, a rare Pine Barrens ecosystem, and a rebuilt truss bridge
5.4 英里 35 分钟在 Shift 应用中
继续前行
Mass Central Rail Trail与其他步道和受保护的自行车道相连。选择一个方向,在地图上查看。
这条步道 可以继续的路线 其他自行车道
关于Mass Central Rail Trail
- 路面
- Mixed. The Wayside section (Waltham to Hudson) is paved, except about half a mile of stone dust in Wayland between Cochituate Road and Route 20. The Wachusett Greenways sections (West Boylston, Holden, Rutland, Oakham, Barre) are mostly stone dust, with a few short on-road links.
- 规定
- On the DCR-owned Wayside section, dogs must be on a leash (Town of Wayland notice on DCR rules). Rutland State Park charges an entrance fee in summer.
- 冬季
- Not plowed between Waltham and Sudbury; it is left for skiing. Farther west, only the parking lots and entrances are cleared. 来源
- 所有步道的路况
- 卫生间
- Wachusett section: Wachusett Greenways keeps portable toilets at eight spots in West Boylston, Holden, Rutland and Oakham, including year-round accessible ones at Mill Street and River Street (Holden) and the Route 122 lot and 102 Glenwood Road (Rutland). Rutland State Park also has restrooms. There are none listed on the Wayside section.
- 餐饮
- Wayland Center (cafes, bakeries, a pub), Russell's Garden Center snacks at Route 20 in Wayland, and food a quarter mile south of the Union Avenue crossing in South Sudbury.
- 管理单位
- Wayside section: Massachusetts DCR. Wachusett section: built and kept up by Wachusett Greenways (a nonprofit) with the towns and DCR/MWRA landowners. The whole 104-mile route is coordinated by the MCRT Alliance.
- 别名
- MCRT, Mass Central Rail Trail Wayside, Wayside Rail Trail, Wayside Trail, Wachusett Greenways rail trail, Central Mass rail trail
这些信息的来源2026年10月19日 核实
- masscentralrailtrail.org/completing-the-mcrt
- masscentralrailtrail.org
- masscentralrailtrail.org/current-mcrt-projects
- masscentralrailtrail.org/mcrt-2025-recap
- masscentralrailtrail.org/sudbury
- masscentralrailtrail.org/wayland
- masscentralrailtrail.org/waltham
- masscentralrailtrail.org/holden
- masscentralrailtrail.org/rutland
- masscentralrailtrail.org/barre
- wachusettgreenways.org
- yahoo.com/news/us/articles/mass-gets-7-5-miles-175515805.html
- waylandpost.org/news/mass-central-rail-trail-more-to-come
- 128bc.org/news/good-news-for-walkers-and-cyclists-linden-street-bridge-reopens
- en.wikipedia.org/wiki/Mass_Central_Rail_Trail
- en.wikipedia.org/wiki/Mass_Central_Rail_Trail%E2%80%94Wayside
- mtbproject.com/trail/5926199/mass-central-rail-trail-west-boylston-to-holden
- wayland.ma.us/node/35053
- gbfs.bluebikes.com/gbfs/en/station_information.json
- api-v3.mbta.com/stops
- openstreetmap.org/relation/6674358
