Assabet River Rail Trail
The Assabet River Rail Trail is a paved path on an old railroad line in two open parts: about 5 miles from Marlborough to Hudson, and about 3.4 miles from South Acton through Maynard to the Stow line. The two parts do not connect yet. People use it for easy rides and walks between town centers, ponds and the Assabet River.
- 长度
- 8.5 英里
- rail trail
- 路面
- 铺装路面
- 入口
- 8 处
- 见地图
从Lincoln Street at Highland Street到South Acton station
8 个入口中有 6 个可停车 · 查看位置
从 South Acton 站乘火车返回 · 下几班火车
开放。 截至 2026年10月21日 无封闭。
从哪里进入
Lincoln Street at Highland Street, Marlborough (south end)
South end of the trail, near downtown Marlborough.
- MWRTA Route 108 and the 495 Connector stop at Newton and Weed Streets, about a 5 minute walk.
Hudson Street, Marlborough
Main Marlborough parking for the trail. North of here the trail passes Fort Meadow Reservoir and wetlands along Flagg Brook.
- Lots off Hudson Street across from Kelleher Field, and at 56 Jefferson St.
Washington Street (Route 85), Hudson
Road crossing on Route 85.
- Trail parking at 157 Washington St, Hudson.
Main Street (Route 62), downtown Hudson
The trail crosses Main Street in downtown Hudson. Shops and places to eat nearby.
路线导航Wilkins Street lot, Hudson (end of the south section)
End of the south section. The Mass Central Rail Trail starts here and runs east to Sudbury. The ARRT does not go on to Stow. The next open part starts at White Pond Road, about 4 miles away by the old rail line.
- Trail lot off Wilkins Street.
White Pond Road, Maynard/Stow line (end of the north section)
South end of the paved north section. Track Road, a dirt road open to the public, goes on west from here into Stow.
- Parking at the White Pond Road trailhead.
Main Street, downtown Maynard
The trail runs through downtown Maynard, near the Mill and Main complex. Shops and places to eat nearby.
- Maynard municipal lots in the town center.
South Acton station, Acton (north end)
North end of the trail.
- South Acton station, MBTA Fitchburg Line commuter rail. MWRTA 495 Connector also stops at the station.
- Trail parking on Maple Street, by the station.
如何到达
- 乘公交
- Take the MBTA Fitchburg Line commuter rail to South Acton.
展开收起
The trail starts at the station and runs south through Maynard. For the Marlborough end, MWRTA Route 108 and the 495 Connector stop at Newton and Weed Streets, a short walk from the trail.
- 停车
- Marlborough: lots off Hudson Street and at 56 Jefferson St.
展开收起
Hudson: Wilkins Street and 157 Washington St. Maynard: town center lots and White Pond Road. Acton: Maple Street by South Acton station.
骑车去,坐火车回
沿步道单程骑行,再乘通勤铁路返回。South Acton 站就在步道上。
继续前行
Assabet River Rail Trail与其他步道和受保护的自行车道相连。选择一个方向,在地图上查看。
这条步道 可以继续的路线 其他自行车道
关于Assabet River Rail Trail
- 路面
- Paved on both open sections. Track Road in Stow, past the end of the north section, is a dirt road.
- 餐饮
- Places to eat in downtown Hudson and downtown Maynard, where the trail crosses Main Street.
- 管理单位
- Each town looks after its own part (Marlborough, Hudson, Maynard and Acton). Assabet River Rail Trail, Inc. (ARRT Inc.) is the volunteer nonprofit that supports the trail.
- 别名
- ARRT, Assabet Rail Trail, Assabet River Trail, Assabet River Bike Path
这些信息的来源2026年10月21日 核实
- en.wikipedia.org/wiki/Assabet_River_Rail_Trail
- townofhudson.org/791/Assabet-River-Rail-Trail
- townofmaynard-ma.gov/314/Assabet-River-Rail-Trail
- stow-ma.gov/394
- freedomsway.org/place/assabet-river-rail-trail
- fiftyplusadvocate.com/2023/04/13/assabet-river-rail-trail-keeps-pace-with-growing-communities
- senatoreldridge.com/press-releases/senator-eldridge-and-representatives-gregoire-and-gentile-announce-marlborough-receiving-a-massdot-grant-to-extend-the-assabet-river-rail-trail
- traillink.com/trail/assabet-river-rail-trail
- mobilitydatabase.org/feeds/gtfs/mdb-439
- vc.mwrta.com/gtfs/google_transit.zip
- api-v3.mbta.com/stops
- api-v3.mbta.com/alerts
- gbfs.bluebikes.com/gbfs/en/station_information.json
- openstreetmap.org/relation/8443314